(a) at the top working down to (d).
These sections show clearly the different level changes that occur between the retention slabs (slabs that hold water for sustainable flow into the harbour) and the two buildings.These drawings are still in quite a raw stage and have yet to be annotated but I thought uploading them would give a quick update on how the final major project is progressing.
![]() |
| fig. 1 |
![]() |
| fig. 2 |









